City of Casey · Berwick · Cranbourne · Narre Warren · Call 0485 813 822
Site cut, fill, trench, drainage - bobcat + excavator

Earthworks and excavation prices in the City of Casey - 2026 guide

Earthworks in the City of Casey sit between $480 (small post-hole job, half-day mini-excavator) and $25,000+ (full house pad cut + fill on a sloping block). The big cost drivers are material type (clay vs rock), spoil disposal, and machine size.

Below are realistic 2026 ranges. Every quote includes machine hire, operator, and a stated spoil-disposal pathway. Call 0485 813 822 for an exact quote.

Typical 2026 prices for earthworks and excavation in the City of Casey

A written quote should be itemised against the work below.

ServiceTypical range (AU 2026)What's included
Mini-excavator hire + operator (per day) $680 - $980 1.7-tonne machine. Most domestic jobs.
3-tonne excavator + operator (per day) $880 - $1,200 Mid-size domestic + light commercial.
5-tonne excavator + operator (per day) $1,200 - $1,600 Larger pads + commercial.
Bobcat + operator (per day) $680 - $980 Skid-steer, smaller fenced jobs.
Tipper (per truck-load) $280 - $480 8-tonne truck. Spoil removal.
Truck + dog (larger spoil removal) $480 - $880 20-tonne. Bulk earthworks.
Trenching - drainage / services (per linear m) $45 - $95 per m 600mm deep × 300mm wide. Backfill not included.
Site cut + level (small house pad, ~150sqm) $3,500 - $8,500 Excavation + grading. Spoil disposal extra.
Site cut + level (medium, ~250sqm) $8,500 - $15,500
Site cut + level (large / sloping) $15,500 - $35,000+ Engineered cut + retaining walls.
Fill + compaction (per cubic m delivered + spread) $45 - $85 Clay / road base / sand.
Rock breaking (per hour) +$220 - $380 per hour Hammer hire on top of base machine rate.
Driveway preparation (cut + base) $45 - $85 per sqm Before paving / concrete.
Pool excavation (typical 8×4m pool) $5,500 - $12,500 Excavation + spoil disposal.
Stump removal (machinery) $280 - $880 Per stump with machine.
Site survey / set-out $680 - $1,400 Pre-excavation establishing levels + boundaries.

Prices indicative for the City of Casey in 2026. Final quote depends on your site - call 0485 813 822 for an exact number.

Need an exact price for your job?

Quotes are written and free, with no obligation.

What changes the price on your job

The ranges above are the starting point. These five factors are what move a quote up or down within (or sometimes outside) those bands.

  1. Material - clay easy, rock hard (hammer required), bedrock $$$.
  2. Spoil disposal - local tip $50/cubic m, contaminated soil $$$.
  3. Access - narrow gates, tight access requires smaller machine (slower).
  4. Volume - under 50 cubic m fixed-cost premium; bulk earthworks per-cube cheaper.
  5. Engineering - sloping sites often need engineered cut + retaining wall design.

Red flags - what to watch for in quotes

We see these patterns every week from operators we'd never recommend. If a quote you've received contains one of these, ask before signing.

  • Quotes without stated spoil disposal - surprise $1,500-$5,000 truck-load fees.
  • Cash earthworks without WHS / WorkCover - uninsurable if site damage.
  • Cheap-end operators without dial-before-you-dig service location - gas/water/electrical strikes.
  • Quotes without site survey - wrong volumes = wrong cost.
  • 'Owner-supplied' fill from random source - usually contaminated, fails compaction test.

How to get an accurate quote in 5 minutes

Have the following ready when you call 0485 813 822 (or jot it on the quote form) and we can give you a real number in one call, not five.

  1. Approximate volume (cubic m or LxWxD).
  2. Photo of site + access.
  3. Soil type if known.
  4. Whether spoil leaves site or stays.
  5. Service location plan (gas, water, electrical, sewer).

Frequently asked questions

Half-day or full-day?
Mini-excavator + operator min ~4 hours ($480). Most domestic jobs done in a day. Full-day $680-$980.
Spoil disposal - who pays?
Tip fees included in our quotes (transparent). $50/cubic m local tip; contaminated soil $180+/cube; reactive clay $80-$120.
Dial Before You Dig?
Yes - always lodged 5 working days before excavation. Free service. Required by law.
Insurance - what level?
Ask for the certificate of currency for public liability and confirm WorkCover is current before any work starts.
Can you do urgent jobs?
Yes - emergency drainage / water-main breaks can be booked as urgent work. After-hours rate applies.
Soil import?
Yes - clean fill or road-base delivered + spread + compacted. Per-cubic-m rates.
Owner-supplied fill - can I save?
Only if compaction-tested + contamination-cleared. Otherwise you risk failing the slab compaction inspection.

Ready for an exact quote on your Casey job?

Free written quotes. No obligation.

Call 0485 813 822