Excavation & bobcat hire across the City of Casey.
From Endeavour Hills in the north-west to Clyde and Cranbourne South in the south-east. One of Australia’s fastest-growing LGAs — Officer, Clyde, Cranbourne East and Pakenham new-build pipeline keeps our gear within 15 minutes of every Casey job.
Suburbs we cover.
Featured suburb pages.
Detailed local guides — soil type, typical job mix, what we usually quote.
Other City of Casey suburbs we work in.
Two soil zones, two engineering conversations.
North-west clay belt (Endeavour Hills, Hampton Park, eastern Hallam, Narre Warren North): Newer Volcanic reactive clay. AS 2870 Class M to H1. 30–50mm seasonal swell. We strip 300mm of topsoil, lime-stabilise the subgrade where strength is low, then build back up in 100mm lifts of compacted crushed rock. Driveways and slabs here need extra sub-base thickness or they crack within 5 years.
South-east growth corridor (Cranbourne, Clyde, Officer, Pakenham): mostly silty-loam over sandy clay. AS 2870 Class P to M. Much more forgiving sub-base but watch for shallow groundwater in parts of Clyde — we pump and de-water before any pool dig or deep footing in that area.
When you need a planning permit (not just a building permit).
- No permit: residential cut/fill under 1m, tied to an approved building permit, outside any overlay.
- Planning permit required: bulk earthworks over 100m³ cut/fill, or any work inside a Vegetation Protection Overlay, Significant Landscape Overlay or Heritage Overlay. Typical fee $1,200-$3,000 plus 6-8 week assessment.
- AS 3798 compliance: mandatory for all commercial earthworks — warehouse pads, school car parks, civil subdivisions. Geotech supervisor on site at each lift.
- Worksafe SWMS: any trench over 1.5m needs documented shoring or battering. We carry trench shields and run engineered slopes.
What we do.
Site cut & fill
$4K–$15K. Topsoil strip, batter, engineer-tested compaction.
See →Driveway preparation
$80–$140/m². Sub-base prep ready for concrete or asphalt.
See →Foundation excavation
From $1,800/day. Strip, pad and pier footings on reactive clay.
See →Pool excavation
$3K–$7K. Concrete or fibreglass pool digs with spoil cart-away.
See →Drainage trenching
$80–$150/lin.m. Stormwater, sewer, electrical and gas trenching.
See →Free site visit anywhere in City of Casey.
Clay belt or growth corridor. Soil check at the visit. Fixed quote in 48 hours.